1. Technical Assistance Facility for the Sustainable Energy for All (SE4ALL) Initiative West & Central Africa: Identification Study for Hydropower Potentials on Akanyaru Trans boundary River, Rwanda/Burundi, May - July 2014.
  2. Technical due-diligence/reviews for Funding Eligibility Note to the French Development Bank (AFD)/KAM for financing 6 private small hydropower projects in Kenya namely KTDA Nyamindi Hydro 2 MW, KTDA Gura Hydro 5 MW, KTDA Chania Hydro 1 MW, KTDA Iraru Hydro 1.5 MW, KTDA North Mathioya 5MW and KTDA South Mara, July to October 2013.
  3. Assessment on Hydropower Vulnerability and Sustainability w.r.t climate change and anthropogenic activities in Tanzania funded by World Bank and implemented by SWECO Norge/GEHYDRO Consulting, 2013 and 2015.
  4. Hydropower Review and Assessment/Preparation for Integrated Water Resources Management and Development (IWRMD) Plans for Pangani River Basin, Lake Tanganyika and Lake Nyasa Basins in Tanzania. Funded by World Bank/GoT, Dec 2012 to July 2014.
  5. Preparing Risk Assessment and Dam Safety Plan of Karazi Dam (Tanzania) and Maira Dam (Kenya) within Kagera River Basin under Nile Basin Organization (NBI/NELSAP), July – December 2014.
  6. Geotechnical Consulting Services for Giciye Small Hydropower 4 MW Project in Nyabihu District, Rwanda. May 2012 to December 2012.
  7. Technical due-diligence/reviews and certifying funding eligibility note to the French Development Bank (AFD) for financing 6 private small hydropower projects in Uganda namely Kyambura SHP 7 MW, Lubilia SHP 5 MW, Kakaka SHP 5 MW, Rwimi I SHP 5 MW, Siti I SHP 3 MW and Lower Nsongya SHP 7 MW, May 8, 2012 to April 2013.
  8. Dam Review Panel Member for Designs and Constructions for LWH Project (Gatsibo-8, Nyanza-23, Karongi 12 and 13 Earthfill dams), Rwanda, 2011 to 2015
  9. Feasibility Study for North Mathioya Small Hydropower scheme, Murang’a, Kenya
  10. Feasibility Study for Tagabi Hydropower Upgrade Scheme, Kericho, Kenya
  11. Feasibility Study for Kipchoria Hydropower scheme, Nandi Hills, Kenya
  12. Feasibility Study for Suma Hydropower Scheme, Tukuyu, Tanzania
  13. Feasibility Study for Ruo Hydropower Upgrade Scheme, Mulanje, Malawi
  14. Feasibility Study and Construction Management for Giciye Small Hydropower Scheme, Rwanda
  15. Feasibility Study for Gura Small Hydropower Project, Nyeri, Kenya
  16. Feasibility Study for Nchwera Small Hydropower Project, Bushenyi, Uganda
  17. Reconnaissance Study of Mini Hydropower Potentials in Kagera Region, Tanzania, 2009-2010
  18. Feasibility Study for RuhudjiMapembas4 MW Mini Hydropower Development, Njombe Diocese, Tanzania. September 2005
  19. Design Studies for Reinforcement & Upgrading of Dar es Salaam, Kilimanjaro and Arusha 132 kV Transmission Lines , Tanzania
  20. Emergency Power Plants: Environmental Audit Work for Power Plants at NyakatoMwanza, Ubungo Dar and Tegeta IPTL sites, Tanzania
  21. Ngorongoro Conservation Area Electrification Studyfor 33kV underground cable, NgorongoroConservation Area, Arusha Tanzania.
  22. Construction Supervision for LOWER KIHANSI HYDROPOWER PROJECT, TANZANIA (180 MW).
  23. Con­ceptual to Feasibility study for TANZANIA POWER VI: HYDROPOWER PROJECTS [RUMAKALI (246 MW) & RUHUDJI (500 MW) RIVER POWER SCHEMES].
  24. Electrification studies for Songea and Mbinga districts + Rehabili­tation/Up-rating studies for three mini hy­dropower stations, Tanzania.
  25. MANDERA Hydropower Scheme Feasibil­ity studies. The scheme studies were financed by NORDIC countries financial assistance. Tanga Tanzania
  26. Construction Supervisions for Pangani Falls Re­development Project (68 MW), Tanzania.
  27. Design Studies for 220 kV Transmis­sion Lines for Lower Kihansi Hydropower Project, Tanzania
  28. Detail Design Studies for Lower Kihansi Hydro Elec­tric Power Project (180 Mw), Tanzania
  29. Construction Supervisions for interconnection 132 kV Transmission line [route length 160 km] from Masaka, Uganda to Bukoba, Tanzania, 1991